Pot Survey – Shakedown September 2022

August 29 - Sept 1, 2022 F/V Integrity West Ocean City, MD

Author

Mike O’Brien (UMCES)

Packing list

🔲 Large cooler

🔲 Sampling bags

🔲 Data sheets/clipboard

🔲 Two kill buckets

🔲 GPS

🔲 MS222

🔲 Measuring board

🔲 Weight bucket with scales

🔲 Fish totes

Participants

August 29

August 30 - Sept 1

Schedule

29 August

Scientific crew (DHS, MOB)

  • 0800 - 0900 Pack CBL truck (2017 Silverado) at Solomons, MD. Drive to West Ocean City, MD
  • 0900 - 1230 Drive to MD Coastal Bays Program office
    • 8219 Stephen Decatur Hwy, Berlin, MD 21811
  • 1230 - 1250 Load pots and two rope drums onto trailer
  • 1250 - 1300 Drive to Sea Born, Inc.
    • 12906 Sunset Ave, Ocean City, MD 21842 Full crew (DHS, MOB, KH, mate)
  • 1300 - 1330 Unload pots. KH/mate begin loading pots onto vessel.
  • 1330 - 1530 DHS/MOB drive to MD Coastal Bays Program. Repeat pot loading/return/unloading.
  • 1530 - 1600 Drop trailer off at MDCBP. Return to W Ocean City.
  • 1600 - 1800 Finish rigging ground line
  • 1800 Check into Microtel
    • 12536 Ocean Gateway, Ocean City, MD 21842

30 August

Full crew (DHS, MOB, KH, mate)

  • 02:30 Meet at F/V Integrity
  • 03:00 Depart ocmd for K07
  • 38 21.2012, -74 42.1501
  • 05:25 Arrive K07. Deploy pots.
  • 05:35 Finish deploying pots. Depart for K10
  • 38 18.1654, -74 42.6398
  • 06:00 Arrive K10. Deploy pots.
  • 06:10 Finish deploying pots. Depart for J11
  • 38 17.1557, -74 43.7804
  • 06:25 Arrive J11. Deploy pots.
  • 06:35 Finish deploying pots. Depart for O12
  • 38 16.1313, -74 39.0571
  • 07:05 Arrive O12. Deploy pots.
  • 07:15 Finish deploying pots. Depart for 2209_1
  • 38 13.4668, -74 37.9816
  • 07:40 Arrive 2209_1. Deploy pots.
  • 07:50 Finish deploying pots. Depart for 2209_2
  • 38 12.5833, -74 46.641
  • 08:45 Arrive 2209_2. Deploy pots.
  • 08:55 Finish deploying pots. Depart for ocmd
  • 11:05 Arrive ocmd

Pick up dry ice from Harris Teeter

  • 31221 Americana Pkwy, Selbyville, DE 19975

31 August

Full crew (DHS, MOB, KH, mate)

  • 02:30 Meet at F/V Integrity
  • 03:00 Depart ocmd for K07
  • 05:25 Arrive K07. Deploy pots.
  • 05:40 Finish deploying pots. Depart for K10
  • 06:05 Arrive K10. Deploy pots.
  • 06:20 Finish deploying pots. Depart for J11
  • 06:35 Arrive J11. Deploy pots.
  • 06:50 Finish deploying pots. Depart for O12
  • 07:20 Arrive O12. Deploy pots.
  • 07:35 Finish deploying pots. Depart for 2209_1
  • 08:00 Arrive 2209_1. Deploy pots.
  • 08:15 Finish deploying pots. Depart for 2209_2
  • 09:10 Arrive 2209_2. Deploy pots.
  • 09:25 Finish deploying pots. Depart for ocmd
  • 11:35 Arrive ocmd
  • 11:55 Pick up trailer from MD Coastal Bays Program
  • 12:10 Remove pots from F/V Integrity, load onto trailer. Unload at MD Coastal Bays program. Repeat as needed.

13:35 Scientific crew drive back to Solomons, MD

Distances

Distance, nautical miles
ocmd 2209_1 2209_2 O12 J11 K07 K10
ocmd 0.00 23.01 16.91 21.60 17.78 18.94 18.56
2209_1 23.01 0.00 6.87 2.80 5.86 8.40 5.96
2209_2 16.91 6.87 0.00 6.94 5.10 9.32 6.41
O12 21.60 2.80 6.94 0.00 3.85 5.62 3.47
J11 17.78 5.86 5.10 3.85 0.00 4.25 1.35
K07 18.94 8.40 9.32 5.62 4.25 0.00 3.06
K10 18.56 5.96 6.41 3.47 1.35 3.06 0.00
Distance, time
ocmd 2209_1 2209_2 O12 J11 K07 K10
ocmd - 02 h 55 m 02 h 10 m 02 h 45 m 02 h 15 m 02 h 25 m 02 h 20 m
2209_1 02 h 55 m - 00 h 55 m 00 h 25 m 00 h 45 m 01 h 05 m 00 h 45 m
2209_2 02 h 10 m 00 h 55 m - 00 h 55 m 00 h 40 m 01 h 10 m 00 h 50 m
O12 02 h 45 m 00 h 25 m 00 h 55 m - 00 h 30 m 00 h 45 m 00 h 30 m
J11 02 h 15 m 00 h 45 m 00 h 40 m 00 h 30 m - 00 h 35 m 00 h 15 m
K07 02 h 25 m 01 h 05 m 01 h 10 m 00 h 45 m 00 h 35 m - 00 h 25 m
K10 02 h 20 m 00 h 45 m 00 h 50 m 00 h 30 m 00 h 15 m 00 h 25 m -